Skip to main content

Engineering gallery

Real customer-grade samples, tooling fixtures, and CAD station layouts with zero third-party identifiers.

4 verified engineering visuals
6-tank ultrasonic gantry batch cleaning layout CAD
02 6-tank ultrasonic gantry batch cleaning layout CAD
Perforated 304 stainless multi-tier ultrasonic wash basket
03 Perforated 304 stainless multi-tier ultrasonic wash basket
High-capacity multi-board stainless batch cleaning rack CAD
04 High-capacity multi-board stainless batch cleaning rack CAD

Station architecture and quality gates

4 connected process stages engineered for repeatable cycle time and inline verification.

  1. TANK 01 1,350 mm Infeed · 60 s

    Infeed Roller Staging & 1-Min Rust/Flux Ultrasonic Wash

    Quality gate: Removes weld oxidation & flux residue evenly across all 2,000 parts

  2. TANK 02–04 3 Sequential Tanks

    Triple Pure-Water Cascade Rinsing (Auto Water Refresh)

    Quality gate: Auto-refreshing pure water prevents ionic carry-over

  3. TANK 05–06 2 Ultrasonic Stages

    Dual Alcohol Ultrasonic Dehydration & Final Wash

    Quality gate: Spot-free, moisture-free leads ready for immediate coating

  4. OUT-07 10,200–15,000 PCS/H

    Enclosed Outfeed Roller Conveyor Discharge

    Quality gate: Zero operator vapor exposure; uniform repeatable cycle dwell

Before vs. after workshop economics (4 metrics)
Operational impact comparison for PRJ-CLN-17: 6-Tank 15,000 PCS/H Magnetic-Fixture Gantry Batch Cleaning Line
MetricManual baselineAutomated lineOperational impact
Cleaning Capacity 2,500–3,500 PCS/H manual benchtop ultrasonic10,200–15,000 PCS/H 6-tank gantry line4× washing throughput
Chemical Safety Open rust-remover & alcohol tubsSealed 3-bay frame with isolated staging conveyorsProtects operator health
Rinse Water Purity Manual water changes once per shift3 pure-water tanks with automatic water refreshEliminates ionic residue
Coating Adhesion Yield Periodic resin delamination from flux traceConsistent 6-stage ultrasonic + dual alcohol washHigher encapsulation reliability
Footprint, utilities and technical parameters (6 specs)
Verified mechanical, electrical, and tooling specifications for PRJ-CLN-17
Engineering parameterVerified specification
Hourly Throughput 10,200–15,000 thermistor elements per hour
Basket & Fixture Capacity 4 magnetic separation fixtures/basket × 300–500 PCS = 1,200–2,000 PCS/basket
6-Tank Process Sequence 1× Rust-Remover/Ultrasonic (1 min) → 3× Pure-Water Rinse (auto refresh) → 2× Alcohol Ultrasonic
Overall Dimensions (L×W×H) 6,900 × 1,660 × 2,660 mm (4,200 mm main 6-tank unit + dual 1,350 mm infeed/outfeed conveyors)
Target Components Post-welding thermistors & electronic sensors with magnetically attractable leads
Control & Enclosure PLC recipe control (dwell time, ultrasonic power, temp, auto-fill) inside sealed 3-bay enclosure
Detailed station notes, root bottlenecks and Shenzhen FAT criteria

Root bottlenecks solved

  • Manual lifting of heavy multi-fixture baskets created ergonomic fatigue and splash hazards.
  • Stagnant manual rinse water quickly contaminated subsequent batches with ionic flux residue.
  • High-volume 10,000+ PCS/H welding output outpaced benchtop ultrasonic cleaners.

Shenzhen FAT acceptance gates

  • Overhead gantry transfer verified cycling 4-fixture baskets (2,000 PCS) smoothly without part dislodgement.
  • Auto-refreshing pure-water rinse tanks verified maintaining target conductivity across multi-hour runs.
  • Dual alcohol ultrasonic wash confirmed zero visible flux/oil residue under microscopic inspection.
  • Enclosure fume containment and interlock doors tested prior to crating.

Full station engineering breakdown

TANK 01

Infeed Roller Staging & 1-Min Rust/Flux Ultrasonic Wash

Operator places 4 magnetic separation fixtures (300–500 PCS each) into hanging basket on 1,350 mm roller conveyor; overhead gantry transfers to 1-min rust-remover ultrasonic tank.

TANK 02–04

Triple Pure-Water Cascade Rinsing (Auto Water Refresh)

Gantry hoists basket sequentially through 3 pure-water rinse tanks equipped with automated fresh-water replenishment valves.

TANK 05–06

Dual Alcohol Ultrasonic Dehydration & Final Wash

Two sequential alcohol ultrasonic tanks displace residual moisture and trace organics inside sealed fume-contained chambers.

OUT-07

Enclosed Outfeed Roller Conveyor Discharge

Gantry places clean basket onto 1,350 mm discharge roller conveyor for smooth operator pickup without opening chemical tank doors.

Direct OEM engineering desk in Shenzhen and Kunshan

Need a line similar to PRJ-CLN-17?

Share your sensor drawing and target daily output for a 48-hour layout and payback estimate.

WhatsApp