CJR Sensor — Engineering Delivery Brief (PRJ-CLN-17)
Shenzhen CJR Electronics Co., Ltd. (Client identity anonymized per NDA)
sales@robotlyne.com / +86 135 1081 6743
https://sensolyne.com/case-studies/high-throughput-thermistor-batch-cleaning-system/
6-Tank 15,000 PCS/H Magnetic-Fixture Gantry Batch Cleaning Line
Post-weld thermistor elements with magnetic leads · 4 magnetic separation fixtures/basket (1,200–2,000 PCS)
Engineered a 6,900 mm enclosed 6-tank overhead gantry cleaning line washing magnetic-lead welded thermistors in 4-fixture baskets (1,200–2,000 PCS/load)—automating 1-min ultrasonic rust/flux wash, 3 auto-refreshing pure-water rinses, and 2 ultrasonic alcohol baths at 10,200–15,000 PCS/H.
- 10,200–15,000 PCS/H
- Hourly Capacity
- 1,200–2,000 PCS (4× Fix)
- Basket Payload
- 6 Automated Stages
- Process Tanks
- 6,900 × 1,660 × 2,660 mm
- Line Footprint
Engineering gallery
Real customer-grade samples, tooling fixtures, and CAD station layouts with zero third-party identifiers.
Station architecture and quality gates
4 connected process stages engineered for repeatable cycle time and inline verification.
- TANK 01 1,350 mm Infeed · 60 s
Infeed Roller Staging & 1-Min Rust/Flux Ultrasonic Wash
Quality gate: Removes weld oxidation & flux residue evenly across all 2,000 parts
- TANK 02–04 3 Sequential Tanks
Triple Pure-Water Cascade Rinsing (Auto Water Refresh)
Quality gate: Auto-refreshing pure water prevents ionic carry-over
- TANK 05–06 2 Ultrasonic Stages
Dual Alcohol Ultrasonic Dehydration & Final Wash
Quality gate: Spot-free, moisture-free leads ready for immediate coating
- OUT-07 10,200–15,000 PCS/H
Enclosed Outfeed Roller Conveyor Discharge
Quality gate: Zero operator vapor exposure; uniform repeatable cycle dwell
Before vs. after workshop economics (4 metrics)
| Metric | Manual baseline | Automated line | Operational impact |
|---|---|---|---|
| Cleaning Capacity | 2,500–3,500 PCS/H manual benchtop ultrasonic | 10,200–15,000 PCS/H 6-tank gantry line | 4× washing throughput |
| Chemical Safety | Open rust-remover & alcohol tubs | Sealed 3-bay frame with isolated staging conveyors | Protects operator health |
| Rinse Water Purity | Manual water changes once per shift | 3 pure-water tanks with automatic water refresh | Eliminates ionic residue |
| Coating Adhesion Yield | Periodic resin delamination from flux trace | Consistent 6-stage ultrasonic + dual alcohol wash | Higher encapsulation reliability |
Footprint, utilities and technical parameters (6 specs)
| Engineering parameter | Verified specification |
|---|---|
| Hourly Throughput | 10,200–15,000 thermistor elements per hour |
| Basket & Fixture Capacity | 4 magnetic separation fixtures/basket × 300–500 PCS = 1,200–2,000 PCS/basket |
| 6-Tank Process Sequence | 1× Rust-Remover/Ultrasonic (1 min) → 3× Pure-Water Rinse (auto refresh) → 2× Alcohol Ultrasonic |
| Overall Dimensions (L×W×H) | 6,900 × 1,660 × 2,660 mm (4,200 mm main 6-tank unit + dual 1,350 mm infeed/outfeed conveyors) |
| Target Components | Post-welding thermistors & electronic sensors with magnetically attractable leads |
| Control & Enclosure | PLC recipe control (dwell time, ultrasonic power, temp, auto-fill) inside sealed 3-bay enclosure |
Detailed station notes, root bottlenecks and Shenzhen FAT criteria
Root bottlenecks solved
- Manual lifting of heavy multi-fixture baskets created ergonomic fatigue and splash hazards.
- Stagnant manual rinse water quickly contaminated subsequent batches with ionic flux residue.
- High-volume 10,000+ PCS/H welding output outpaced benchtop ultrasonic cleaners.
Shenzhen FAT acceptance gates
- Overhead gantry transfer verified cycling 4-fixture baskets (2,000 PCS) smoothly without part dislodgement.
- Auto-refreshing pure-water rinse tanks verified maintaining target conductivity across multi-hour runs.
- Dual alcohol ultrasonic wash confirmed zero visible flux/oil residue under microscopic inspection.
- Enclosure fume containment and interlock doors tested prior to crating.
Full station engineering breakdown
TANK 01
Infeed Roller Staging & 1-Min Rust/Flux Ultrasonic Wash
Operator places 4 magnetic separation fixtures (300–500 PCS each) into hanging basket on 1,350 mm roller conveyor; overhead gantry transfers to 1-min rust-remover ultrasonic tank.
TANK 02–04
Triple Pure-Water Cascade Rinsing (Auto Water Refresh)
Gantry hoists basket sequentially through 3 pure-water rinse tanks equipped with automated fresh-water replenishment valves.
TANK 05–06
Dual Alcohol Ultrasonic Dehydration & Final Wash
Two sequential alcohol ultrasonic tanks displace residual moisture and trace organics inside sealed fume-contained chambers.
OUT-07
Enclosed Outfeed Roller Conveyor Discharge
Gantry places clean basket onto 1,350 mm discharge roller conveyor for smooth operator pickup without opening chemical tank doors.
Equipment used in PRJ-CLN-17
Turnkey line family
Industrial & Medical ProbesRelated engineering guides
Direct OEM engineering desk in Shenzhen and Kunshan
Need a line similar to PRJ-CLN-17?
Share your sensor drawing and target daily output for a 48-hour layout and payback estimate.