Skip to main content

Engineering gallery

Real customer-grade samples, tooling fixtures, and CAD station layouts with zero third-party identifiers.

4 verified engineering visuals
Aligned black-head NTC probes on production carrier board
02 Aligned black-head NTC probes on production carrier board
Benchtop vacuum epoxy defoaming & glue preparation unit
03 Benchtop vacuum epoxy defoaming & glue preparation unit
6-tank ultrasonic gantry cleaning cell
04 6-tank ultrasonic gantry cleaning cell

Station architecture and quality gates

6 connected process stages engineered for repeatable cycle time and inline verification.

  1. ST-01 2,000–2,200 PCS/H

    Multi-Reel Wire Cutting, Stripping & Carrier Boarding

    Quality gate: Consistent lead exposure eliminates manual board-taping bottleneck

  2. ST-02 1,600–2,000 PCS/H

    Dual-Station MF58 Axial Thermistor Resistance Welder

    Quality gate: 1:1 pace match with front-end wire boarding

  3. ST-03 24 Frames/H (~70k/Day)

    Automated Ultrasonic Cleaning & Drying Line

    Quality gate: Clean surface guarantees strong silicone/epoxy adhesion

  4. ST-04 10,000–14,000 PCS/H

    Auto Glue Rolling, Ratio Weighing, Vacuum Mix & Dip Coater

    Quality gate: Eliminates manual ratio drift and trapped epoxy bubbles

  5. ST-05 4,000–5,000 PCS/H

    Vibratory Bowl Shell Insertion & Multi-Head Epoxy Potting

    Quality gate: Replaces 5 manual shell-inserting & syringe operators

  6. ST-06 100% Batch Logged

    Computerized Resistance Testing & Database Archival

    Quality gate: Eliminates human grading mix-ups with instant digital QA logs

Before vs. after workshop economics (4 metrics)
Operational impact comparison for PRJ-ROI-04: 20,000 PCS/Day MF58 NTC Sensor Line — 17 Operators Cut, 10-Mo Payback
MetricManual baselineAutomated lineOperational impact
Direct Labor Headcount 23+ manual operators across 6 workshop rooms6 automated line tenders (17 positions eliminated)17 operators reduced
Capital Payback Period Continuous wage inflation & recruitment churnFull equipment + tooling payback in ~10 months<1 year ROI verified
Glue Mixing & Bubble Control Manual scale mixing & open-air pouringAuto rolling + ratio weight control + vacuum degassingConsistent dielectric yield
Cleaning Throughput Manual solvent dipping with uneven residue24 frames/h (2 wash + 1 dry), ~70k PCS/day capacityHeadroom for 3× line growth
Footprint, utilities and technical parameters (6 specs)
Verified mechanical, electrical, and tooling specifications for PRJ-ROI-04
Engineering parameterVerified specification
Target Shift Capacity ~20,000 finished MF58 NTC sensors per 10-hour shift
Verified Staffing Impact 17 direct operators eliminated (~10-month documented payback on equipment + tooling)
Fixture & Circulation Kit 2,000 wire carrier boards · 120 encapsulation frames (300 PCS/frame) · 10 turnover carts
Ultrasonic Wash Spec 2 ultrasonic wash passes + 1 drying pass · 24 frames/hour capacity
Glue Preparation Suite Automatic glue roller + recipe/weight-monitored mixer + vacuum degassing mixer
Shell Potting & Testing 4,000–5,000 PCS/H bowl-fed potting + computerized DB-backed resistance testing
Detailed station notes, root bottlenecks and Shenzhen FAT criteria

Root bottlenecks solved

  • Over 20 manual operators across cutting, welding, washing, glue mixing, shell potting, and testing.
  • Manual two-part epoxy mixing introduced ratio errors and air voids that caused premature insulation failures.
  • Management required hard ROI under 12 months before approving full-line automation CAPEX.

Shenzhen FAT acceptance gates

  • Boarding (2,000–2,200 PCS/H) and dual-station MF58 welding (1,600–2,000 PCS/H) balanced continuously over 8-hour FAT.
  • Vacuum-mixed resin verified bubble-free on cross-sectioned sample probes after curing.
  • Computerized resistance database verified exporting OK/NG batch logs with zero missed records.
  • 120-frame / 10-cart circulation cycle confirmed supporting 20,000 PCS/day without oven starvation.

Full station engineering breakdown

ST-01

Multi-Reel Wire Cutting, Stripping & Carrier Boarding

Automated payoff, precision stripping, tinning, and 20-piece standardized carrier board taping (2,000 circulation boards).

ST-02

Dual-Station MF58 Axial Thermistor Resistance Welder

Automatic MF58 diode feeding, lead straightening/trimming, and dual-head closed-loop resistance welding.

ST-03

Automated Ultrasonic Cleaning & Drying Line

Two programmable ultrasonic wash passes + 1 hot-air drying pass removing flux/oil across high-density racks.

ST-04

Auto Glue Rolling, Ratio Weighing, Vacuum Mix & Dip Coater

Closed-loop resin rolling, ratio-weighed automatic mixing, vacuum degassing, and 1 high-speed encapsulation machine (120 frames, 10 carts).

ST-05

Vibratory Bowl Shell Insertion & Multi-Head Epoxy Potting

Dual vibratory bowls orient metal/plastic shells automatically while multi-head valves dispense uniform resin volume.

ST-06

Computerized Resistance Testing & Database Archival

Room-state or constant-temp multi-channel resistance verification with automatic PLC OK/NG judgment and database storage.

Direct OEM engineering desk in Shenzhen and Kunshan

Need a line similar to PRJ-ROI-04?

Share your sensor drawing and target daily output for a 48-hour layout and payback estimate.

WhatsApp