Real customer-grade samples, tooling fixtures, and CAD station layouts with zero third-party identifiers.

4 verified engineering visuals
Automated multi-rack roller staging & sorting conveyor CAD
02 Automated multi-rack roller staging & sorting conveyor CAD
High-density multi-tier stainless testing carrier rack CAD
03 High-density multi-tier stainless testing carrier rack CAD
Multi-channel dry-air Hi-Pot & resistance contact fixture
04 Multi-channel dry-air Hi-Pot & resistance contact fixture

Station architecture and quality gates

4 connected process stages engineered for repeatable cycle time and inline verification.

  1. ST-01 3 Boards × 20 PCS

    60-Piece Multi-Board Frame Infeed Conveyor

    Quality gate: Three length groupings (50–200 / 200–400 / 400–600 mm) supported

  2. ST-02 3,000–4,000 PCS/H

    Automated High-Voltage Dielectric (Hi-Pot) Station

    Quality gate: Programmable voltage/leakage limits logged per slot index

  3. ST-03 3,000–4,000 PCS/H

    Stabilized Air-State Room-Temp Resistance Station

    Quality gate: Zero liquid contamination; zero post-test degreasing needed

  4. ST-04 Zero-Mixup Sort

    Automated NG Cutting / Ejection & OK Discharge

    Quality gate: Physically impossible for failed probes to reach packing

Before vs. after workshop economics (4 metrics)
Operational impact comparison for PRJ-AIR-09: CR-726D3 Oil-Free Air Hi-Pot & Resistance Testing Line (4,000 PCS/H)
MetricManual baselineAutomated lineOperational impact
Testing Throughput 600–800 PCS/H manual Hi-Pot + bath check3,000–4,000 PCS/H (excl. manual clamping)5× EOL screening speed
Post-Test Washing Solvent wash + drying oven after oil bath100% dry air process — zero washing requiredEliminates whole wash step
NG Escape Risk Operator hand-picking failed wires from racksAutomated mechanical NG cut / reject station0% sorting mix-ups
SKU Length Flexibility Fixed trays failing on 400–600 mm leadsModular frames covering 50–200 / 200–400 / 400–600 mm3 length families on 1 line
Footprint, utilities and technical parameters (6 specs)
Verified mechanical, electrical, and tooling specifications for PRJ-AIR-09
Engineering parameterVerified specification
Equipment Model CR-726D3 Inline Oil-Free Air Hi-Pot & Resistance Testing Line
Rated Throughput 3,000–4,000 PCS/H (excluding offline manual frame clamping)
Fixture Frame Capacity 60 PCS / frame (3 wire-card plates × 20 products/plate)
Supported Wire Lengths 3 length groups: 50–200 mm · 200–400 mm · 400–600 mm
Line & Chassis Dimensions Full line: 7,400 mm · Main unit: 2,500 × 1,600 × 1,900 mm · Conveyor height: ~850 mm (min 1 m staging)
NG Rejection Mechanism Automated mechanical NG cutting / ejection station driven by PLC pass/fail memory
Detailed station notes, root bottlenecks and Shenzhen FAT criteria

Root bottlenecks solved

  • Oil bath drag-out forced an extra post-test degreasing and drying station.
  • Three different cable length ranges (50–600 mm) tangled during manual bath loading.
  • Human NG picking occasionally allowed failed Hi-Pot sensors into packed customer cartons.

Shenzhen FAT acceptance gates

  • Sustained 3,000–4,000 PCS/H cycle speed verified across all 3 wire-length frame groups.
  • 100% automatic mechanical rejection confirmed on deliberately shorted and out-of-tolerance test probes.
  • Ambient air resistance repeatability verified against golden reference standard probes.
  • Conveyor height (850 mm) and 7,400 mm footprint matched cleanly to customer workshop layout.

Full station engineering breakdown

ST-01

60-Piece Multi-Board Frame Infeed Conveyor

Operator clamps three 20-piece wire-card plates into one rigid 60-piece fixture frame on the 850 mm height infeed conveyor (supports 50–600 mm harnesses).

ST-02

Automated High-Voltage Dielectric (Hi-Pot) Station

Transverse gantry indexes 60-piece frames into shielded multi-channel Hi-Pot probes verifying insulation integrity cleanly in air.

ST-03

Stabilized Air-State Room-Temp Resistance Station

Draft-shielded ambient chamber compares sensors against calibrated reference standards without any oil immersion.

ST-04

Automated NG Cutting / Ejection & OK Discharge

Dedicated NG station mechanically cuts or ejects failed units immediately upon PLC fail flag before passing OK frames to discharge conveyor.

Direct OEM engineering desk in Shenzhen and Kunshan

Need a line similar to PRJ-AIR-09?

Share your sensor drawing and target daily output for a 48-hour layout and payback estimate.