4 verified engineering visuals
6-tank ultrasonic gantry batch cleaning architecture CAD
02 6-tank ultrasonic gantry batch cleaning architecture CAD
Upstream multi-camera post-weld CCD inspection cell
03 Upstream multi-camera post-weld CCD inspection cell
Multi-tier stainless batch cleaning carrier rack CAD
04 Multi-tier stainless batch cleaning carrier rack CAD

Station architecture and quality gates

5 connected process stages engineered for repeatable cycle time and inline verification.

  1. ST-01 2,000–2,500 PCS/H

    Precision Twin-Wire Boarding (±0.5 mm Strip Tolerance)

    Quality gate: Holds ±0.5 mm strip length preventing shell-wall short circuits

  2. ST-02 1,800–2,000 PCS/H

    Automated Welding & 4-Station Precision Tinning

    Quality gate: Consistent solder fillet & lead centering across 20-pc boards

  3. ST-03 1,800–2,000 PCS/H

    Inline CCD Weld-Offset Inspection Gate

    Quality gate: Stops weld-offset scrap before downstream encapsulation

  4. ST-04 1,800–2,000 / 6k–7k

    Dual-Station Automatic Cleaning & 6k–7k Encapsulation

    Quality gate: Contamination-free resin bond supporting <0.5% line scrap

  5. ST-05 3,000–4,000 PCS/H

    Shell Potting (150 Fixtures) & Auto Resistance / Hi-Pot

    Quality gate: Automated electrical verification locks outgoing quality <0.5%

Before vs. after workshop economics (4 metrics)
Operational impact comparison for PRJ-FIN-12: 20,000 PCS/Day NTC Finishing Line with Inline CCD & Auto-Cleaning (<0.5% Defect)
MetricManual baselineAutomated lineOperational impact
Overall Line Defect Rate 2.5%–4.0% scrap discovered post-potting<0.5% defect rate via inline CCD + auto-clean5×–8× scrap reduction
Wire Strip Repeatability ±1.2 mm manual bench strippers±0.5 mm automated twin-wire boardingEliminates shell-edge shorts
Online Shift Staffing 16–18 manual workers across finishing line6 online operators for 20,000 PCS/day65% headcount reduction
Pre-Potting Quality Gate Zero optical check before epoxy potting1,800–2,000 PCS/H inline CCD weld-offset gateSaves shells & epoxy resin
Footprint, utilities and technical parameters (6 specs)
Verified mechanical, electrical, and tooling specifications for PRJ-FIN-12
Engineering parameterVerified specification
Daily Shift Target 20,000 finished NTC sensors/day · Overall defect rate <0.5%
Wire Specification 24#–26# twin wire · 50–1,200 mm length · ±0.5 mm strip tolerance
Front Magazine Buffers 60–80 empty boards input · 25–30 finished boards output
Inline Quality Stations 1,800–2,000 PCS/H CCD weld-offset AOI + dual-station auto cleaner
Encapsulation & Potting 6,000–7,000 PCS/H coater (60 frames, 5 carts) + 1 potting machine (150 fixtures)
EOL Testing & Crew 3,000–4,000 PCS/H auto Hi-Pot & resistance tester · 6 online operators
Detailed station notes, root bottlenecks and Shenzhen FAT criteria

Root bottlenecks solved

  • Weld-offset defects went unnoticed until after irreversible epoxy shell potting.
  • Inconsistent manual stripping beyond ±1 mm caused exposed conductor shorts inside tight metal shells.
  • Manual cleaning between welding and coating slowed line flow and introduced chemical variability.

Shenzhen FAT acceptance gates

  • ±0.5 mm wire stripping tolerance verified via SPC sampling across 50–1,200 mm twin-wire lengths.
  • Inline CCD gate verified flagging 100% of intentionally offset weld beads at 1,800–2,000 PCS/H.
  • Combined line yield confirmed ≥99.5% (<0.5% defect rate) during sustained endurance run.
  • 6-operator shift workflow validated from empty board loading through 4,000 PCS/H Hi-Pot sorting.

Full station engineering breakdown

ST-01

Precision Twin-Wire Boarding (±0.5 mm Strip Tolerance)

Processes 24#–26# twin wire (50–1,200 mm) with 60–80 empty / 25–30 finished board magazine buffers.

ST-02

Automated Welding & 4-Station Precision Tinning

Dedicated 4-station tinning + thermistor welding module locked to standardized carrier board pitch.

ST-03

Inline CCD Weld-Offset Inspection Gate

Direct inline CCD camera verifies weld alignment immediately after ST-02 before any resin or shell cost is added.

ST-04

Dual-Station Automatic Cleaning & 6k–7k Encapsulation

Dual-station auto-cleaner feeds straight into 1 automatic encapsulation unit cycling 60 frames & 5 turnover carts.

ST-05

Shell Potting (150 Fixtures) & Auto Resistance / Hi-Pot

1 shell potting machine (150 fixtures) followed by 1 automated Hi-Pot & resistance tester screening 100% of finished probes.

Direct OEM engineering desk in Shenzhen and Kunshan

Need a line similar to PRJ-FIN-12?

Share your sensor drawing and target daily output for a 48-hour layout and payback estimate.

WhatsApp