Zero-surprise global delivery and Shenzhen FAT
Real-material acceptance runs in Shenzhen, CE/UL-ready electrical panels for Mexico, Europe, and Asia, globally stocked parts, and 24-hour remote VPN support.
Six client acceptance gates from URS to SAT
Every overseas machine order follows a fixed engineering sign-off sequence before shipment.
-
Gate 01
Sample and URS lock
Lock target UPH, tolerances, BOM brands, and voltage from your real sensor samples.
-
Gate 02
3D design review
Approve 3D mechanical layouts, footprint, and electrical schematics before machining.
-
Gate 03
In-house build
CNC fabrication, cabinet wiring, vision setup, and PLC/HMI coding at our Shenzhen HQ.
-
Gate 04
Witnessed FAT
Multi-hour endurance run on your real materials, on-site, via SGS/TÜV, or live HD stream.
-
Gate 05
Export crate and spares
Vacuum anti-corrosion crating with optional 2-year wear-parts kit packed inside.
-
Gate 06
VPN and on-site SAT
24-hour remote VPN PLC and vision diagnostics plus scheduled on-site SAT and training.
Specify off-the-shelf international brands
Keep local maintenance simple by requesting globally stocked automation components on your BOM.
PLC and motion
Siemens, Mitsubishi, Omron, Panasonic
Vision and optics
Keyence, Cognex, Hikrobot, Telecentric
Pneumatics and guides
SMC, Festo, THK, HIWIN
Test instruments
GW Instek, Rek, Chroma, Hioki
Regional voltage and electrical safety matrix (Americas, EU, Asia)
| Region | Grid standard | Electrical and safety | Documentation |
|---|---|---|---|
| Mexico & North America | 480V / 208V / 240V, 60Hz | UL508A-ready panel, OSHA guarding and light curtains | English manuals, E-diagrams, BOM and FAT report |
| Germany & EU | 400V / 230V, 50Hz | CE Machinery Directive, safety relays and E-stops | CE Technical File support, English schematics and spares |
| Turkey, India & SEA | 380V–415V / 220V–240V, 50Hz | Enclosed frames, humidity and Poka-Yoke safeguards | English and optional Chinese manuals plus video guides |
Do we receive full English manuals, wiring diagrams, and PLC access?
How is FAT conducted if our engineers cannot fly to Shenzhen?
How fast is remote technical support after installation?
Direct OEM engineering desk in Shenzhen and Kunshan
Have specific voltage, CE/UL, or BOM requirements?
Standalone bottleneck stations or IATF 16949 turnkey lines, reviewed directly by our Shenzhen mechanical, vision, and PLC engineers.