Skip to main content

Engineering gallery

Real customer-grade samples, tooling fixtures, and CAD station layouts with zero third-party identifiers.

5 verified engineering visuals
Silver PTFE EV motor leads aligned on 20-slot carrier board
02 Silver PTFE EV motor leads aligned on 20-slot carrier board
Multi-length parallel EV sensor harnesses ready for potting
03 Multi-length parallel EV sensor harnesses ready for potting
Multi-pin precision electrical contact fixture
04 Multi-pin precision electrical contact fixture
Dual-zone thermal tunnel curing oven
05 Dual-zone thermal tunnel curing oven

Station architecture and quality gates

7 connected process stages engineered for repeatable cycle time and inline verification.

  1. ST-01 2,000–2,200 PCS/H

    5-Reel Wire Cutting, Stripping, Tinning & Carrier Boarding

    Quality gate: Inline CCD verifies strip length & carrier pitch; cuts 2 operators

  2. ST-02 1,600–2,000 PCS/H

    Dual-Station NTC Resistance Welding

    Quality gate: Closed-loop weld positioning eliminates manual lead skew

  3. ST-03 1,800–2,400 PCS/H

    Optional Multi-Camera AI CCD Post-Weld Inspection

    Quality gate: Replaces 2–3 manual microscope inspectors with zero eye fatigue

  4. ST-04 10,000–14,000 PCS/H

    High-Speed Silicone Dip Coating + Primary Tunnel Oven

    Quality gate: Uniform silicone film thickness prevents thermal shock cracking

  5. ST-05 1,800–2,500 PCS/H

    Shell Insertion, 2-Valve Epoxy Potting & Secondary Curing

    Quality gate: Void-free resin fill locked to exact shell tip geometry

  6. ST-06 800 PCS/H × 2 Units

    Parallel Terminal Crimping & Connector Housing Cells (×2)

    Quality gate: Inline continuity & pull-check blocks loose terminals before EOL

  7. ST-07 1,800–2,000 PCS/H

    Integrated Hi-Pot, 25°C & 85±1°C Water-Bath Testing Line

    Quality gate: 100% dual-temp R-T/Beta verification + automatic NG separation

Before vs. after workshop economics (4 metrics)
Operational impact comparison for PRJ-EV-02: EV Drive-Motor Temperature Sensor 8-Module Line (22,000 PCS/Day)
MetricManual baselineAutomated lineOperational impact
Total Direct Operators 18–22 manual workers across 7 bench zones7 operators overseeing all 8 automated modules~65% labor savings
Silicone Coating Labor 3.5 manual dipping & rack-loading workers0.4 operator running 10,000–14,000 PCS/H coater3 operators saved on 1 step
Carrier Circulation Flow Loose bundled wires tangled between steps2,000 standardized boards (1,000 active + 1,000 return)Zero manual re-racking damage
High-Voltage & R-T Proof Manual Hi-Pot + spot-checked bath readings100% inline Hi-Pot + 25°C & 85±1°C PC-logged sortingFull EV OEM batch compliance
Footprint, utilities and technical parameters (7 specs)
Verified mechanical, electrical, and tooling specifications for PRJ-EV-02
Engineering parameterVerified specification
Daily Shift Target 20,000–22,000 finished EV motor sensors per 10-hour shift
Wire & Harness Range 5-reel simultaneous feed · 50–1,500 mm wire lengths
Carrier Board Inventory 2,000 standardized wire boards (1,000 active online + 1,000 baking/return cycle)
Potting Fixture Inventory 1,000 3-plate shell-positioning potting fixture sets (20 PCS/board)
Line Balance Architecture 1× Wire Prep + 1× Weld + 1× Shared Coater + 1× Potting + 2× 800 PCS/H Terminal Cells + 1× EOL Tester
EOL Electrical Test Suite High-voltage dielectric withstand + 25°C & 85±1°C precision water-bath resistance + auto NG pick
Control & Data System PLC + Host-Computer PC database collection with exportable batch reports
Detailed station notes, root bottlenecks and Shenzhen FAT criteria

Root bottlenecks solved

  • Manual tinning, hand-welding, and dip-coating benches required 18+ workers and introduced bent leads.
  • Re-racking loose harnesses between coating, potting, and testing caused frequent insulation nicks.
  • Single-point room-temperature checking missed 85°C Beta-curve drift required by EV motor OEMs.

Shenzhen FAT acceptance gates

  • Wire prep + dual-station welding verified continuously at ≥2,000 PCS/H on customer motor harness reels.
  • Dual-valve epoxy potting confirmed void-free across 3-layer shell fixtures after secondary tunnel curing.
  • EOL test line validated for ±1°C bath stability at 85°C and 100% automatic rejection of seeded NG probes.
  • Complete 7-operator line staffing balance demonstrated during multi-hour Shenzhen FAT run.

Full station engineering breakdown

ST-01

5-Reel Wire Cutting, Stripping, Tinning & Carrier Boarding

Handles 50–1,500 mm leads continuously: payoff → cut → strip → flux → tin → board load → tape → inline CCD verify → discharge.

ST-02

Dual-Station NTC Resistance Welding

Uses standardized wire carrier boards directly from ST-01; 1 operator tends boarding + welding modules together.

ST-03

Optional Multi-Camera AI CCD Post-Weld Inspection

Deep-learning optical inspection on 20–30 board magazines checking weld offset, cold joints, and missing heads.

ST-04

High-Speed Silicone Dip Coating + Primary Tunnel Oven

0.4-operator shared unit completes 40,000 coats (1st & 2nd pass) in 4 hours; 20-piece boards transfer straight to adjustable tunnel oven.

ST-05

Shell Insertion, 2-Valve Epoxy Potting & Secondary Curing

Dual dispensing valves paired with 1,000 precision 3-layer shell-positioning fixture sets (bottom, middle locate, cover plate) + tunnel cure.

ST-06

Parallel Terminal Crimping & Connector Housing Cells (×2)

Each modular cell integrates 1P wire stripping, terminal crimping, rubber-shell insertion, and inline resistance verification (1 op/cell).

ST-07

Integrated Hi-Pot, 25°C & 85±1°C Water-Bath Testing Line

Head positioning → high-voltage insulation test → 25°C bath R-T → 85±1°C bath R-T → PC database logging → auto NG picking → buffer unload.

Direct OEM engineering desk in Shenzhen and Kunshan

Need a line similar to PRJ-EV-02?

Share your sensor drawing and target daily output for a 48-hour layout and payback estimate.

WhatsApp