CJR Sensor — Engineering Delivery Brief (PRJ-DO35-11)
Shenzhen CJR Electronics Co., Ltd. (Client identity anonymized per NDA)
sales@robotlyne.com / +86 135 1081 6743
https://sensolyne.com/case-studies/high-volume-ntc-welding-production-line/
DO35 MF58 Welding, Alcohol Cleaning & 300-Channel Thermal-Shock Line
DO35 MF58 glass NTC sensors · 24#/26# paired wire (150–1,500 mm) · 300-channel aging
Engineered an end-to-end DO35 MF58 production line sized for 30,000 PCS/day turnover—linking 8-wheel wire prep (15–35 mm exposed ends), single-channel medium-frequency inverter welding (25–40 mm head offset), 2-tank alcohol ultrasonic cleaning, 6,000–7,000 PCS/H encapsulation, and a 300-terminal simultaneous thermal-shock aging + 25°C/85°C MES test rig.
- 30,000 PCS / Day
- Turnover Sizing
- 300 PCS Simultaneous
- Parallel Aging Test
- 20 Frames/H (120s)
- Alcohol Ultrasonic
- 25–40 mm Controlled
- Head Offset Hold
Engineering gallery
Real customer-grade samples, tooling fixtures, and CAD station layouts with zero third-party identifiers.
Station architecture and quality gates
5 connected process stages engineered for repeatable cycle time and inline verification.
- ST-01 1,600–2,000 PCS/H
8-Wheel Wire Cutting, Tin Dipping & Boarding
Quality gate: Repeatable exposed wire length & tension across all 8 payoff wheels
- ST-02 900–1,200 PCS/H
Single-Channel DO35 Medium-Frequency Inverter Welder
Quality gate: Modular single-channel cells scale linearly as volume grows
- ST-03 20 Frames/H (120 s)
Robot-Transferred 2-Tank Alcohol Ultrasonic Cleaner
Quality gate: Removes 100% of flux/welding spatter prior to coating
- ST-04 6,000–7,000 PCS/H
Wire Straightening & Compact Dual-Pass Encapsulation
Quality gate: Uniform concentric resin droplets across 300-piece frames
- ST-05 300 PCS Parallel
300-Terminal Thermal-Shock Aging + 25°C/85°C MES Tester
Quality gate: Spreadsheet export + direct LAN upload to factory MES
Before vs. after workshop economics (4 metrics)
| Metric | Manual baseline | Automated line | Operational impact |
|---|---|---|---|
| Wire Prep & Taping Labor | 4 manual cutters & board-taping workers | 1 automatic 8-wheel unit (3 operators saved) | 75% front-end labor cut |
| Post-Weld Cleaning | Open manual solvent tubs | Enclosed robot 2-tank alcohol ultrasonic (120 s/frame) | Safe, uniform wash quality |
| Thermal-Shock Aging | Manual small-batch cycling & Excel hand entry | 300 simultaneous terminals + LAN/MES auto upload | 10× aging throughput |
| Coating Concentricity | Uneven manual head heights | Controlled 25–40 mm head-to-board geometry | Uniform waterproof encapsulation |
Footprint, utilities and technical parameters (6 specs)
| Engineering parameter | Verified specification |
|---|---|
| Target Wire & Element | DO35 MF58 small-head glass NTC · 24#/26# paired wire · 150–1,500 mm length · 15–35 mm exposed |
| Front-End Geometry Control | 20 PCS/board · 25–40 mm post-weld head extension from carrier board edge |
| Ultrasonic Alcohol Cleaning | 2-frame buffer + robot transfer + 2 alcohol ultrasonic tanks + dry · 20 frames/h (120 s/frame) |
| Encapsulation Logistics | 6,000–7,000 PCS/H coater · 10 carts × 12 frames = 120 frames (300 PCS/frame) · 2,000 wire boards |
| Thermal-Shock & R-T Rig | 300 terminals (2 boards) testing 300 PCS simultaneously · 10 s–5 min timer · 25°C & 85°C · 500–1,500 mm leads |
| Data & Control Stack | PLC + Touchscreen HMI · Medium-frequency inverter weld · Spreadsheet export, LAN & MES connectivity |
Detailed station notes, root bottlenecks and Shenzhen FAT criteria
Root bottlenecks solved
- Manual lead cutting and welding varied head-to-edge height, causing dipped coatings to cover unequal lengths.
- Manual alcohol soaking exposed operators to vapors and left inconsistent surface cleanliness.
- Single-channel aging testers bottlenecked 20k–30k daily shipments and lacked LAN/MES data upload.
Shenzhen FAT acceptance gates
- 25–40 mm post-weld head offset held consistently across 20-piece boards during 1,200 PCS/H inverter welding.
- 2-tank alcohol ultrasonic cycle verified clean under white-light residue test at 120 s/frame.
- 300-terminal thermal-shock & 25°C/85°C test rig verified logging all 300 channels accurately over LAN/MES.
- 120-frame / 10-cart logistics cycle validated supporting 30,000 PCS/day turnover.
Full station engineering breakdown
ST-01
8-Wheel Wire Cutting, Tin Dipping & Boarding
Feeds 8 single or 4 paired wires (24#/26#, 150–1,500 mm, 15–35 mm exposed) onto 20-pc boards (2,000 boards total); cuts 3 operators.
ST-02
Single-Channel DO35 Medium-Frequency Inverter Welder
Magnetic-box feed, lead straightening, servo-driven weld head using medium-frequency DC inverter holding exact 25–40 mm head offset from board edge.
ST-03
Robot-Transferred 2-Tank Alcohol Ultrasonic Cleaner
2-frame buffer conveyor feeds overhead robot indexing racks through 2 ultrasonic alcohol wash tanks + hot-air drying.
ST-04
Wire Straightening & Compact Dual-Pass Encapsulation
Desktop straightening prep → 1 compact automatic coater handling both 1st & 2nd pass across 120 frames (15 boards × 20 pcs = 300/frame) & 10 carts.
ST-05
300-Terminal Thermal-Shock Aging + 25°C/85°C MES Tester
Two test boards totaling 300 terminals run programmable 10 s–5 min aging + dual-temp R25/R85 checks on 500–1,500 mm harnesses with LAN/MES export.
Equipment used in PRJ-DO35-11
Turnkey line family
Appliance & HVAC NTCRelated engineering guides
More Appliance & HVAC cases
All 17 cases
20,000 PCS/Day NTC Finishing Line with Inline CCD & Auto-Cleaning (<0.5% Defect)
18-Stage Lights-Out NTC Sensor Smart Factory with Robots & MES
20,000 PCS/Day MF58 NTC Sensor Line — 17 Operators Cut, 10-Mo Payback
Direct OEM engineering desk in Shenzhen and Kunshan
Need a line similar to PRJ-DO35-11?
Share your sensor drawing and target daily output for a 48-hour layout and payback estimate.