CJR Sensor — Engineering Delivery Brief (PRJ-SLV-15)
Shenzhen CJR Electronics Co., Ltd. (Client identity anonymized per NDA)
sales@robotlyne.com / +86 135 1081 6743
https://sensolyne.com/case-studies/inline-sleeving-bead-welding-and-housing-assembly-line/
Single-Wire Alignment, Dual Sleeving, Bead Welding & Shell Press Line
Dual-sleeved single-wire MF52 NTC probes · Heat-shrink forming & heated shell press
Integrated 10 delicate manual bench operations—single-wire cutting, boarding, dual-tube insulating sleeve feeding & optical checks, vibratory-bowl bead welding, front/back CCD inspection, tube pushing, heat-shrink forming, lead bending, and shell pressing—into a continuous 600–800 PCS/H 3-operator line.
- 600–800 PCS/H
- Verified Speed
- 3 Operators Total
- Operators Needed
- 2 Sleeves / Cycle + CCD
- Sleeving Check
- AC220V · 0.5–0.7 MPa
- Utilities
Engineering gallery
Real customer-grade samples, tooling fixtures, and CAD station layouts with zero third-party identifiers.
Station architecture and quality gates
4 connected process stages engineered for repeatable cycle time and inline verification.
- ST-01 600–800 PCS/H
Single-Wire Cutting, Straightening & Board Loading
Quality gate: Verifies straight parallel wire presentation before sleeving
- ST-02 2 Sleeves / Cycle
Dual-Wire Insulating Sleeve Feeding & Optical Verify
Quality gate: 100% dual-sleeve presence check prevents short-circuit escapes
- ST-03 600–800 PCS/H
Vibratory-Bowl Bead Welding & Front/Back CCD AOI
Quality gate: Dual-side CCD verifies weld centering & bead integrity before sleeving
- ST-04 Continuous Inline
Tube Pushing, Heat-Shrink Forming, Bending & Shell Press
Quality gate: Consistent shell seating depth eliminates thermal response lag
Before vs. after workshop economics (4 metrics)
| Metric | Manual baseline | Automated line | Operational impact |
|---|---|---|---|
| Inline Process Consolidation | 10 isolated manual bench steps (10–12 workers) | 1 continuous automated line staffed by 3 operators | ~70% labor reduction |
| Missing-Sleeve Risk | Manual threading with occasional missed tubes | Auto 2-sleeve feed + optical verification interlock | 0% missing-sleeve shorts |
| Weld Centering Quality | Hand-aligned bead welds touching metal shells | Bowl-oriented clamping + Front/Back CCD check | Boosts Hi-Pot pass rate |
| Workshop Utilities | Scattered bench heaters & air guns | Single HMI+PLC line on AC220V / 0.5–0.7 MPa | Compact clean footprint |
Footprint, utilities and technical parameters (5 specs)
| Engineering parameter | Verified specification |
|---|---|
| Verified Line Output | 600–800 finished sub-assemblies per hour |
| Process Sequence | Cut/Board → Visual → Dual Sleeving & Verify → Bowl Bead Weld → Front/Back CCD → Tube Push → Heat-Shrink → Bend → Shell Press |
| Sleeving Capacity | 2 insulating sleeves threaded and optically verified per cycle |
| Control System | Unified HMI touchscreen + PLC logic |
| Utilities & Staffing | AC220V · 0.5–0.7 MPa compressed air · 3 operators total |
Detailed station notes, root bottlenecks and Shenzhen FAT criteria
Root bottlenecks solved
- Hand-threading micro insulating tubes onto fine wire ends was slow and prone to skipped sleeves.
- Unchecked bead welds shorted against metal probe shells after heat-shrink assembly.
- Ten separate manual desks created huge inter-station WIP and inconsistent tip seating depth.
Shenzhen FAT acceptance gates
- Dual-sleeve threading and optical presence interlock verified catching missing/short sleeves at 100%.
- Front and back CCD inspection verified distinguishing shifted welds and cracked beads prior to heat-shrink.
- Heat-shrink recovery and shell press depth verified uniform across 500 continuous FAT samples.
- Sustained 600–800 PCS/H line throughput confirmed with 3-operator staffing.
Full station engineering breakdown
ST-01
Single-Wire Cutting, Straightening & Board Loading
Wire payoff rack → precision straightening → cutting → carrier board transfer → high-temp taping → inline visual presence check.
ST-02
Dual-Wire Insulating Sleeve Feeding & Optical Verify
Automated pneumatic sleeving heads thread protective insulating tubes onto both conductors simultaneously with optical verification.
ST-03
Vibratory-Bowl Bead Welding & Front/Back CCD AOI
Vibratory bowl orients black-head NTC beads into clamping dies for precision micro-welding, immediately followed by front & back CCD cameras.
ST-04
Tube Pushing, Heat-Shrink Forming, Bending & Shell Press
Pushes insulating sleeves over welded joints → controlled heat-shrink forming → discharge → precision bending → seated shell pressing → finished collection.
Equipment used in PRJ-SLV-15
Turnkey line family
Industrial & Medical ProbesRelated engineering guides
More Automotive & EV cases
All 17 cases
Automotive Coolant NTC Sensor 3-Section Smart Line (OP140–OP360)
EV Drive-Motor Temperature Sensor 8-Module Line (22,000 PCS/Day)
CR-726A Multi-View CCD Vision Cell for Automotive Oil Temp Sensors
Direct OEM engineering desk in Shenzhen and Kunshan
Need a line similar to PRJ-SLV-15?
Share your sensor drawing and target daily output for a 48-hour layout and payback estimate.